For Moreton Bay builders

Solar for Moreton Bay builders. Trade-direct, single-visit install.

North Lakes, Caboolture, Mango Hill — Trade Solar runs the Bruce Highway corridor weekly. Marine-grade hardware on Redcliffe Peninsula, BAL-rated mounting on D'Aguilar boundary, NatHERS-aligned spec sheets across the LGA.

Why Moreton Bay

High solar yield. Compliance heat. Buyer expectation.

Moreton Bay City is the second-largest detached-house LGA in SE QLD, with the Bruce Highway corridor (North Lakes through to Caboolture) driving most of the activity. NCC climate zone 2 delivers ~5.3 kWh/m² daily irradiance. Solar + battery is a particularly strong fit here for builders running release programs targeting first-home buyer demographics in the northern corridor.

Climate zone
NCC climate zone 2
Daily irradiance
5.3 kWh/m²
Wind region
Region B

Where the new builds are

Growth corridors we cover.

North Lakes / Mango Hill

Caboolture / Burpengary

Morayfield

Narangba / Kallangur

Mango Hill

Kippa-Ring / Margate (Redcliffe Peninsula)

Strathpine

Petrie / Lawnton

How a Moreton Bay job runs

Roof-on Tuesday. Install Friday. Compliance pack with the keys.

01

Submit the job

Moreton Bay address, package, roof-on date.

02

Slot locked to roof-on

We lock the install slot to your roof-on date.

03

Single-visit install

SMS to site super 48hr and 24hr ahead.

04

Compliance + handover

Energex connection, STC rebate, NatHERS spec — one pack.

Moreton Bay-specific

What changes on the day.

  • Northern growth-corridor scale

    Moreton Bay City has the second-highest detached-build volume in SE QLD, with North Lakes, Caboolture, and Mango Hill driving most of it. Trade Solar runs standing weekly capacity along the Bruce Highway corridor.

  • Coastal corrosion (Redcliffe Peninsula)

    Within 1 km of the bay (Kippa-Ring, Margate, Scarborough), we fit marine-grade stainless fasteners and anti-galvanic isolation pads. Standard inclusion.

  • BAL overlay handling

    Estates near Whiteside, Dayboro, and the D'Aguilar Range carry BAL-12.5 / 19 ratings. Trade Solar's standard mounting satisfies these without upcharge.

  • Roof-aspect mapping

    Mango Hill and North Lakes use mixed street orientations. We design split-array systems to help the Whole-of-Home energy budget even when north-facing area is constrained.

Trust

What builders can count on.

  • Behind the builder

    We design, supply, and install for SEQ builders only. Homeowners talk to their builder, not to a retail sales desk.

  • One visit at roof-on

    Install slot locked to your program. Crew fits and commissions in a single visit so the site stays clear.

  • Site-super updates

    SMS before attendance (48 and 24 hours). Treat solar like any other scheduled trade.

  • Selections-sheet packages

    3.3 / 6.6 / 10 kW ladder. Clear upgrades (battery, EV, backup) without a driveway hard sell.

  • NatHERS Whole-of-Home

    Solar helps the NCC 2022 energy budget. It does not lift the thermal fabric rating — we say that plainly.

  • Paperwork in the pack

    STC claim, electrical certification, and warranty registration bound before handover.

  • After handover, they call us

    Warranty and support exit to Trade Solar so your office is not the solar helpdesk.

  • SEQ coverage

    Brisbane, Gold Coast, Sunshine Coast, Logan, Ipswich, Redland, Moreton Bay, Toowoomba. Energex on most LGAs; Ergon on Toowoomba.

FAQ

Builder questions, answered.

Do you sell solar direct to our buyers?

No. Trade Solar is trade-only. We sit behind your brand on the selections sheet. If a homeowner finds us, we send them back to their builder.

When does the crew come, and how long are they on site?

We lock one install slot to roof-on (and final-fit as programmed). The crew aims for a single visit for fit and commission, with SMS to the site super beforehand. Weekdays only, 7am–5pm Brisbane time.

Who handles STCs, Energex/Ergon, and warranty after handover?

We lodge the compliance pack (including STC paperwork) and connection requirements for Energex on Moreton Bay. After handover, the homeowner contacts Trade Solar for warranty and support, not your office.

Ready for a solar design?

Starter 3.3, Standard 6.6, Step-up 10.

We reply within one business day. We lock the install slot to your roof-on date.